Reach out for inquiries at info@ozpro.com.au

Best Construction Material

Melbourne Central

Melbourne Central

Over 400 tonne has gone into ensuring the floor at Melbourne Central was level and sub contractors were in an excellent position to successfully lay tiles. The tiling around the clock basis preparing and covering 300 to 500 square meters per shift. The flooring contractor prepared the existing concrete floor by shot blasting away any loose surface material vacuuming, priming and then pumping in Sure Level NS40 to provide a smooth surface for the tiling contractor to lay his tiles at the next 12 hour shift.